Trusted by leading industry firms
What we do
Phase by phase
Independent risk review for your construction project
You send your project documents; Freeda finds the risk in every page, of every document.
Sorted by what it costs you
See your risk types expressed by severity and exposure. Trace risks in your documents back to their source and easily send them to the relevant teams.
Risk Reports at every phase
Follow the evolution of your project with a specialised risk engineer assigned to your project from start to finish. Producing risk reports at the close of every phase.
Reports & milestones
Alline Kane · Freeda Risk EngineerReport SD
June 12
Report DD
July 24
Critical blockers
Phase-to-phase changes
—Next review: DD, scheduled July 24
Risk is already in your documents
Our decades of pre-construction experience has taught us that for any given asset type in any given location, risk is predictable.
We know how and where to find it
This knowledge enabled us to systematise risk detection; to make it reliable and exhaustive.

Freeda
Project Dossier
001
Project Documents
Asset type
Residential
Location
France




Most risk goes undetected

Freeda
Project Dossier
001
Project Documents
Asset type
Residential
Location
France
Reading the entire file at every phase, against everything that matters, sits between everyone's remit.
It is:
- Too wide for one discipline
- Too detailed for the people running the project
- Outside the scope of mandated inspectors
The same risk has three prices.
All these risks are cheapest to fix on the day they enter the file. But errors are easy to miss, and every phase they survive raises the cost.
The cost of finding out late
A drawing revision
The architect updates the plan. Nothing else moves.
A rebid
Bids already received no longer apply. The schedule slips.
A change order
Work stops, the change is priced by whoever is holding the tools, and the delay compounds into financing costs.

By The Numbers
of projects we reviewed carried
at least one severe risk
risk categories checked at every phase,
from schematic design to bid
the cost of fixing the same error on site
rather than at design stage
of projects we reviewed carried
at least one severe risk
risk categories checked at every phase,
from schematic design to bid
the cost of fixing the same error on site
rather than at design stage

Working with Freeda
We understand the risk and complexity of construction projects because we've lived it.And so we understand what it takes to mitigate the risk and unpack the complexity.That's why we built Freeda to be:
With you from schematic design to bid
With a named expert for your asset type
Findings you can understand and share







